Skip to content
Open today for estimates and questionsMon to Fri 7:30 AM to 6 PM, Sat and Sun 8:30 AM to 4 PM
Glendale Concrete logo

Concrete Slabs in Glendale AZ

Plain, flat, strong concrete slabs, built on a prepared base with steel inside and joints in the right places, and cured properly in the desert heat.

  • Free estimates
  • Base, steel and joints
  • Locally owned
Form boards and welded wire mesh laid on compacted desert soil for a large concrete slab, mountains far behind lot, clear sky in Glendale, AZ

Concrete slabs in numbers

4 incommon thickness for a light duty slab
4 inof compacted base beneath it
7 daysbefore most light trucks can park on it
28 daysto reach full design strength

Concrete slabs are the least showy thing we pour and the most important

Nobody brags about a slab. It sits there, flat and gray, under a shed, a generator, a workshop or a hot tub. But every building that stands up straight stands on something, and in Glendale, AZ that something starts with a good slab.

We pour concrete slabs for sheds, workshops, garage add ons, carports, equipment and outdoor storage. Some are plain. Some have thickened edges, anchor bolts or a floor drain. Each one starts with the same question: what is going to sit on this, and for how long?

Quick answers about concrete slabs

How thick is a normal slab?
Four inches for light loads. Five or six for heavier loads like vehicles, and more under equipment.
Does it need steel?
Almost always. Rebar or wire mesh will not stop cracks, but it keeps them tight and the slab together.
Do you cut joints?
Yes. Joints tell the slab where to crack as it shrinks.
How soon can I build on it?
We usually say about a week for light framing. Heavier loads wait longer.

The base under concrete slabs is what you are really buying

Concrete gets the credit, but the soil and base under it decide how long a slab lasts. In the Valley, native soil can be loose sand and gravel in one spot and rock hard caliche in the next. A slab that rests half on one and half on the other will settle unevenly.

So we strip the topsoil, check for soft spots and fill, and compact a layer of base material in lifts. Where caliche is near the surface, we plan for how it drains and how it affects the layout of the base.

Light gray concrete slab with a smooth edge on desert soil in Glendale, AZ

Pour day for concrete slabs

  1. Forms and steel

    Forms are checked for level and square. Steel is set on supports so it sits in the middle.

  2. Placing

    Concrete is placed and screeded flat, working from the far corner back toward the truck.

  3. Finishing

    The crew floats the surface and finishes it for the use. A shop floor can be smooth. A ramp should not be.

  4. Joints

    Joints are cut when the slab can take a saw without ravelling.

  5. Curing

    In summer heat, we start curing right away and keep the surface protected.

Concrete slabs questions from Glendale owners

What is the difference between concrete slabs for a shed and the slab under a house?

Concrete slabs for sheds, workshops and equipment are flat sheets of concrete on a prepared base. The one under a house is a foundation, and it is built to a different standard. It has thickened edges called grade beams, deeper footings, more steel, plumbing and electrical sleeves set before the pour, and it is inspected before concrete goes in. Many Arizona homes also use post tensioned slabs, which carry cables inside the concrete.

Most of the slabs we pour for sheds and workshops are simpler. A garden shed is a slab. A detached garage or a heavy workshop with a lift sits in the middle, and it needs a conversation about loads, steel and edges. A room addition with walls and a roof is a foundation, and it follows the plans and the inspector.

The cost and the process follow the use. A shed pad can be done in a day or two. A foundation takes planning, inspections and coordination with other trades.

If you are not sure which one you need, describe what will sit on it. Our foundations page covers the house version, and we will tell you plainly when a project needs more than a simple slab.

How thick should concrete slabs be for a workshop with a car lift or heavy tools?

Four inches is a common starting point for a shed or a light workshop, with steel inside and compacted base beneath. A workbench, a riding mower or a stack of lumber might push that to five. A workshop with a vehicle lift, a heavy welder or a machine tool needs more, often six inches or thicker, with more steel and sometimes thickened edges.

A car lift is a special case. The lift maker specifies the minimum thickness and strength of the slab and how far the anchors must be from an edge or a joint. We build to that specification, and we mark the lift position before we cut joints, so no saw cut runs through an anchor point.

Thickness is not the only factor. A thick slab on soft fill will still crack. The base matters just as much, as does proper curing. Concrete that dries too fast in the heat is weak at the surface.

Tell us the heaviest thing that will ever sit on the slab and where. A tool chest on wheels, a pallet stack and a lift are different loads. We use that to set the thickness and the steel, and the estimate spells it out.

Do concrete slabs need rebar, wire mesh or fiber?

Most do, and the choice depends on the load and the use. Steel does not prevent cracks, because concrete shrinks as it cures. What steel does is hold the two sides of a crack together, so it stays tight and the slab stays level and strong.

Rebar, the ribbed steel bars you see in forms, is the strongest and is used for heavier slabs, edges, footings and anywhere a lot of weight will sit. We tie it into a grid and hold it up on supports, so it sits in the middle of the slab and not on the dirt. Welded wire mesh is lighter and common in thin, light duty slabs such as a patio or walk. Fiber, tiny strands mixed into the concrete, helps control small shrinkage cracks near the surface, but it does not replace steel when the loads are significant.

Sometimes we combine them. A slab for a workshop may have rebar and fiber.

Whatever the plan, we write the type and spacing on the estimate, and we place it where it works. Steel that sinks to the bottom of the pour is wasted, and we make sure it does not.

What is a post tensioned slab, and can I cut or drill into mine?

A post tensioned slab is a concrete slab with steel cables running through it inside plastic sleeves. After the concrete gains strength, the cables are pulled tight and anchored, which squeezes the slab like a clamp. This keeps it strong and helps it resist cracking. Many homes in Arizona are built on them, and the concrete slabs we pour for detached structures are usually conventional, with rebar or mesh.

The key thing to know is that the cables are under very high tension. If you cut or drill into one, it can snap, and that can be dangerous and destructive. Never cut, core or drill into a house slab until you know where the cables are. The usual way to find out is to scan the slab with ground penetrating radar or to check the original plans.

We always ask whether a slab is post tensioned before we do any work on it, including concrete cutting. If you are not sure, we scan first. Bring any drawings or notes from when the house was built.

If you plan an addition or a new opening, the engineer's plan should tell us where it is safe to cut.

Where do control joints go on concrete slabs, and why do they matter?

Control joints are shallow cuts that tell a slab where to crack. Concrete shrinks as it cures and dries, and it cannot shrink without pulling. If nothing tells it where to crack, it will choose its own path, usually straight across the middle where everyone can see it.

We plan joints before the pour. A common rule is to space them about two to three times the slab thickness in feet. A four inch slab might have joints every eight to twelve feet. We aim for square or nearly square panels, because long thin panels crack unpredictably. Joints should also line up with corners, posts and columns, where cracks like to start.

The cut is usually about a quarter of the slab thickness. It is made with a saw once the concrete is firm enough to hold an edge, often the next morning, and in hot weather sooner. Waiting too long means the slab cracks before the saw arrives.

Good joints make concrete slabs look planned. Even when a crack does form, it hides in the groove. We mark the joint layout on a sketch for you and cut them on time.

Can concrete slabs be poured on desert fill, or do they need native soil?

They can sit on fill, as long as the fill was placed and compacted properly. Lots in Glendale and around it were often graded flat for building, and some areas have fill that was moved around during development. Properly compacted fill can be a good base. Loose, uncompacted fill is not, because it settles and takes the slab with it.

The issue is finding out which one you have. We probe the ground and look for soft spots. We may dig a test hole to see the layers and check how far the fill goes. If the fill is deep or the area is large, we may recommend a soil report or an engineer's opinion. Where we find loose areas, we dig them out and replace them with compacted base.

Caliche can be part of the picture. A slab that sits half on native caliche and half on fill can crack where the two meet. We plan the base to even that out, sometimes by cutting down the caliche or adding a uniform layer of compacted base above it.

For concrete slabs that matter, such as a workshop or an addition, we are careful and we explain what we find.

Need concrete slabs poured right the first time? Call (623) 777-2215 during shop hours, or use the estimate form. For a home or addition, see foundations.
Stop by the shop

Glendale Concrete

19114 N 54th Ln
Glendale, AZ 85308

Free parking and on site parking. Wheelchair accessible entrance, parking lot and seating. We speak English, Spanish and Portuguese.

Get Directions

Call (623) 777-2215